Archive for 'Blue Renewable Energy'

Schwada Classroom

Schwada Classroom
  • System Size (kWp rating): 92.12 kW
  • Offtaker: Arizona State University
  • Location: 650 E Orange St, Tempe, AZ 85281
  • Commercial Operation Date: 04/01/11
  • Electrical/Solar Install: Roof Mount
Continue Reading →
0

ASU – Physical Education East

ASU – Physical Education East
  • System Size (kWp rating): 223.72 kW
  • Offtaker: Arizona State University
  • Location: 611 E Orange St, Tempe, AZ 85281
  • Commercial Operation Date: 05/12/11
  • Electrical/Solar Install: Roof Mount
Continue Reading →
0

ASU – Parking Structure #3

ASU – Parking Structure #3
  • System Size (kWp rating): 220.43 kW
  • Offtaker: Arizona State University
  • Location: 901 S Myrtle Ave, Tempe, AZ 85281
  • Commercial Operation Date: 02/07/11
  • Electrical/Solar Install: Parking Structure – Tracking Array
Continue Reading →
0

Noble Science and Engineering

Noble Science and Engineering
  • System Size (kWp rating): 107.8 kW
  • Offtaker: Arizona State University
  • Location: 601 E Tyler Mall, Tempe, AZ 85281
  • Commercial Operation Date: 12/07/2010
  • Electrical/Solar Install: Roof Mount
Continue Reading →
0

Fulton Center Garage

Fulton Center Garage
  • System Size (kWp rating): 386.4 kW
  • Offtaker: Arizona State University
  • Location: 715 S College Ave, Tempe, AZ 85281
  • Commercial Operation Date: 12/07/10
  • Electrical/Solar Install: Parking Structure – Tracking Array
Continue Reading →
0

Farmers Education Center

Farmers Education Center
  • System Size (kWp rating): 95.48 kW
  • Offtaker: Arizona State University
  • Location: 1050 S Forest Mall, Tempe, AZ 85281
  • Commercial Operation Date: 12/16/2010
  • Electrical/Solar Install: Roof Mount
Continue Reading →
0