Global Institute of Sustainability
- System Size (kWp rating): 23.6 kW
- Offtaker: Arizona State University
- Location: 800 S Cady Mall, Tempe, AZ 85281
- Commercial Operation Date: 12/23/2009
- Electrical/Solar Install: Roof Mount
Hassayampa Academic Village
- System Size (kWp rating): 118.56 kW
- Offtaker: Arizona State University
- Location: 1201 S McAllister, Tempe, AZ 85281
- Commercial Operation Date: 12/31/2009
- Electrical/Solar Install: Roof Mount 10 Buildings
Naval Facilities Engineering Command
- Location: Barking Sands, Kauai, HI
- Commercial Operation Date: 5/18/2012
- Solar Material Distributor
Noble Science and Engineering
- System Size (kWp rating): 107.8 kW
- Offtaker: Arizona State University
- Location: 601 E Tyler Mall, Tempe, AZ 85281
- Commercial Operation Date: 12/07/2010
- Electrical/Solar Install: Roof Mount
ASU – Parking Structure #3
- System Size (kWp rating): 220.43 kW
- Offtaker: Arizona State University
- Location: 901 S Myrtle Ave, Tempe, AZ 85281
- Commercial Operation Date: 02/07/11
- Electrical/Solar Install: Parking Structure – Tracking Array
ASU – Physical Education East
- System Size (kWp rating): 223.72 kW
- Offtaker: Arizona State University
- Location: 611 E Orange St, Tempe, AZ 85281
- Commercial Operation Date: 05/12/11
- Electrical/Solar Install: Roof Mount
Arizona State University Police Department
- System Size (kWp rating): 10.8 kW
- Offtaker: Arizona State University
- Location: 325 E Apache Blvd, Tempe, AZ 85281
- Commercial Operation Date: 12/31/2009
- Electrical/Solar Installer: Thin Film
Schwada Classroom
- System Size (kWp rating): 92.12 kW
- Offtaker: Arizona State University
- Location: 650 E Orange St, Tempe, AZ 85281
- Commercial Operation Date: 04/01/11
- Electrical/Solar Install: Roof Mount
Sandra Day O’Connor Historical Museum
- Location: 1230 N. College, Tempe
- Commercial Operation Date: 12/31/2009
- Commercial Electrical
Verrado Fire House No. 3
- Location: 2582 N. Verrado Way, Buckeye, AZ
- Commercial Operation Date: 5/31/2012
- Commercial Electrical
Phoenix Veterans Affairs Hospital
- System Size (kWp rating): 4.45MW
- Location: 650 E. Indian School Rd, Phoenix, AZ
- Commercial Operation Date: 8/1/2012
- Electrical/Solar Install: Parking Structure
Yuma County Airport Authority
- System Size (kWp rating): 550.6 kW
- Location: 2191 E 32nd St, Yuma, AZ
- Commercial Operation Date: 12/16/2010
- System Sponsor, Developer, EPC, O&M: Steel Parking Structure